Key Selection Information
| Selection Parameter | Confirmed Information |
|---|---|
| Package | SOD-923 |
| Operating Temperature | -40℃~+125℃ |
| Clamping Voltage | 10V |
| Peak Pulse Current (Ipp) | 8A@8/20us |
| Peak Pulse Power Dissipation (Ppp) | 80W@8/20us |
| Voltage – Breakdown | 5.6V |
| type | ESD |
Product Overview
ESD9B5.0ST5G-SL is a Slkor diode / rectifier identified by the exact orderable code ESD9B5.0ST5G-SL. Its confirmed technical identity includes Operating Temperature -40℃~+125℃, Clamping Voltage 10V, Peak Pulse Current (Ipp) 8A@8/20us, Peak Pulse Power Dissipation (Ppp) 80W@8/20us.
The exact device is described as: 10V 8A@8/20us 80W@8/20us 5.6V Bidirectional 5V SOD-923 TVS Diodes. Selection should be based on the exact package and the operating conditions required by the design, rather than on a nearby family member or a generic part number.
Technical Specifications
| Parameter | Value |
|---|---|
| Package | SOD-923 |
| Operating Temperature | -40℃~+125℃ |
| Clamping Voltage | 10V |
| Peak Pulse Current (Ipp) | 8A@8/20us |
| Peak Pulse Power Dissipation (Ppp) | 80W@8/20us |
| Voltage – Breakdown | 5.6V |
| type | ESD |
| Polarity | Bidirectional |
| Reverse Leakage Current (Ir) | 100nA |
| Reverse Stand-Off Voltage (Vrwm) | 5V |
Selection Notes
- Package: SOD-923
- Operating Temperature: -40℃~+125℃
- Clamping Voltage: 10V
- Peak Pulse Current (Ipp): 8A@8/20us
- Peak Pulse Power Dissipation (Ppp): 80W@8/20us
Application Fit
This exact part is appropriate for designs that require a diode / rectifier with the confirmed package and electrical/function parameters above. Final fit depends on the surrounding circuit, interface, thermal and mechanical requirements of the target design.
Design Considerations
Use the exact SOD-923 footprint/package definition when checking PCB land pattern, assembly clearance and sourcing equivalence.
Related Engineering Resources
- Datasheet — verified HKEQGOO-hosted technical document for this exact product identity.
Quality & Verification Support
Third-party inspection or testing can be arranged according to customer requirements. Testing fees are borne by the buyer. Additional verification requirements can be discussed before shipment. After an order is placed, physical product, label, packaging, and Date Code photos may be provided where appropriate.
Request a Quote
To request a quotation, provide the manufacturer part number, required quantity, destination, target Date Code if applicable, and any testing or inspection requirements.






